Grid: Substation & Plant
Lowery bring our safe, high-compliance culture to the engineering, design, installation, testing and commissioning of high-voltage power plant, assets and cabling to DNO and TSO-operated national critical power infrastructure.
Working for DNOs, Tier 1 contractors and renewable energy developers, we can provide turnkey construction services or M&E and/or civil installation. Our services include:
- Switchgear installation
- Bay and busbar configuration
- CRMS, routing and ducting
- Cabling – HV multi-core, LV and fibre-optic
- Earthing, terminations and glanding
- Protection Panels
- LVAC Panels and Battery Chargers
- Testing and commissioning
We are also trained in modern GIS switchgear, e.g. g3*
Supporting services include:
- ECI/Design Support
- Equipment storage and off-site testing/configuration
- Recoveries
- Site enabling
- Civil base construction
- Civil routework
Uniquely, Lowery is able to directly deliver our own civil engineering and site services – e.g. delivering the cable civils with the cabling or the base before the balance of plant. Many of our personnel are dual-trained with electrical and civil competencies to bake this into our way of doing business. Reduced hand-offs and co-ordination means better quality outcomes.
Working directly with infrastructure owners and as installation and power systems specialist partner to Tier 1 contractors, Lowery pride ourselves on bringing value-add collaboration whatever our role.
* g3 has a reduced GWP (Global Warming Potential) of more than 99% compared to SF6 which has a GWP 24,300 times greater than CO2 and a lifetime in the atmosphere of 1,000 years, putting it at the top of the Kyoto Protocol list.