Grid: Substation & Plant

Grid: Substation & Plant

Lowery bring our safe, high-compliance culture to the engineering, design, installation, testing and commissioning of high-voltage power plant, assets and cabling to DNO and TSO-operated national critical power infrastructure.

Working for DNOs, Tier 1 contractors and renewable energy developers, we can provide turnkey construction services or M&E and/or civil installation. Our services include:

  • Switchgear installation
  • Bay and busbar configuration
  • CRMS, routing and ducting
  • Cabling – HV multi-core, LV and fibre-optic
  • Earthing, terminations and glanding
  • Protection Panels
  • LVAC Panels and Battery Chargers
  • Testing and commissioning

We are also trained in modern GIS switchgear, e.g. g3*

Supporting services include:

  • ECI/Design Support
  • Equipment storage and off-site testing/configuration
  • Recoveries
  • Site enabling
  • Civil base construction
  • Civil routework

Uniquely, Lowery is able to directly deliver our own civil engineering and site services – e.g. delivering the cable civils with the cabling or the base before the balance of plant. Many of our personnel are dual-trained with electrical and civil competencies to bake this into our way of doing business. Reduced hand-offs and co-ordination means better quality outcomes.

Working directly with infrastructure owners and as installation and power systems specialist partner to Tier 1 contractors, Lowery pride ourselves on bringing value-add collaboration whatever our role.

* g3 has a reduced GWP (Global Warming Potential) of more than 99% compared to SF6 which has a GWP 24,300 times greater than CO2 and a lifetime in the atmosphere of 1,000 years, putting it at the top of the Kyoto Protocol list.