Power Supply Upgrades
In January 2004 Lowery Rail Division secured a Framework Agreement with SABCO, a consortium of EDF Energy (formerly Seeboard Contracting Services Ltd.) and Balfour Beatty Rail Projects Ltd working on behalf of Network Rail Southern Region. SABCO was responsible for the Power Supply Upgrades for the Inner London area. The SABCO contract formed part of the overall upgrade scheme for the provision of new power supplies and associated equipment for Network Rail's third rail traction power supply system. The Lowery Limited Framework Agreement was for the provision of cable routes and the installation of power and pilot cables. Lowery's work packages covered an area from Wimbledon to Lewisham. Work started in early 2004 and was completed in 2005. Lowery installed
- 13,000 Metres of Concrete Troughing
- 2,000 Metres of GRP Elevated Route
- 2 No. 6 Way Under Track Crossings
- 4 No. 10 way Under Track Crossings
- 3 No. 20 Way Under Track Crossings
- 1 No. 10 Way Under Road Crossings
- 36,000 Metres of Power Cable
- 12,000 Metres of Pilot Cable
- Numerous other miscellaneous works
| Project: | Bi34 Feeder Renewals |
| Client: | Network Rail |
| Location: | South East |
| Year: | 2005-2007 |
| Project: | Portsmouth Area Infrastructure Upgrade |
| Client: | Network Rail |
| Location: | Portsmouth |
| Year: | 2005-2007 |
| Project: | Power Supply Upgrades |
| Client: | Network Rail |
| Location: | London |
| Year: | 2004-2005 |
![]() |
|
| Click here for details of our Link-Up Categories | |